Kolding Hospital (2010)
Schmidt Hammer Lassen - SHL
Facts:
Architect
schmidt hammer lassen architects
Collaborating architect
CREO
Client
Region Syddanmark
Area
32,000 m2 new built
Construction sum
€ 77 million excl. VAT
Competition
2010, 1st prize in restricted advisor competition
Status
Completion 2014
Full-service consultant
NIRAS
Engineer
NIRAS
Balslev
Landscape architect
GBL
Description:
The extension of Kolding Hospital encompasses 32,000 m2 a bed ward, an emergency ward and a new main entrance. Based on a careful analysis of the surrounding landscape, the existing buildings and the infrastructural conditions, the new design relocates the main entrance to the west of the existing hospital. By relocating the main entrance the hospital gets a whole new identity, and the main entrance becomes visible and clear to patients and relatives. At the same time the internal flow of the hospital is maintained and reinforced, while the entire hospital will be perceived as a complete structure where buildings and the nearby surroundings complement each other.
The masterplan emphasises the potential of the landscape of Kolding River Valley by continuing the orthogonal building structure while allowing the nature and greenery to penetrate the buildings. By situating the new bed ward on top of the existing building, full advantage is taken of the beautiful view of the surrounding forest, and we outline the future developments of the hospital.
Download:
Copyright is held by schmidt hammer lassen architects for all images appearing on this website.
The downloading/electronic copying of material for use by the media or for non-commercial use is permitted subject to copyright laws and restrictions and provided the images not altered or manipulated in any way.
When using the images, drawings or diagrams please credit schmidt hammer lassen architects.
In order to view this page you need JavaScript and Flash Player 8+ support!
